Planned Projects

Our Church renovation and restoration project will better serve our parishioners. The projected minimum cost of Phase I, II & III will be $1.9 million. Planned projects include "Inoperable Church Heating System", "Unsafe and Exposed Church Indoor Lighting", "Outdated Electrical System".

Inoperable Church Heating System
Phase 1

Unsafe and Exposed Church Indoor Lighting
Phase 1

Outdated Electrical System
Phase 1

Cracked and Deteriorating Church Arches
Phase 1

Worn Church Flooring
Phase 1

Damaged Flooring Beside Altar
Phase 1

Worn Church Flooring
Phase 1

Damaged Flooring Beside Altar
Phase 1

Unclean and Plaster Damaged Holy Water Font
Phase 1

Damaged Exterior Garage Wall Stucco and Paint
Phase 2

Cracked Parish Center Entrance Doorway (back)
Phase 2

Damaged and Worn Stucco near Church Door (right front)
Phase 2

Broken Concrete and Parish Center Handrail (back)
Phase 2

Unpainted Parish Rectory Woodwork (Kenmore entrance)
Phase 2

Cracked Rectory Wall Concrete (outside)
Phase 2

Damaged and Worn Stucco on Sacristy Entrance Wall (front)
Phase 2

Deteriorated and Unpainted Parish Rectory Wall (near Garden)
Phase 2

Cracked Parking Lot Concrete
Phase 3

Unsafe and Exposed Church Outdoor Lighting
Phase 3

Older,Worn and Deteriorating Perimeter Gate
Phase 3